Cityringen Copenhagen
City Circle Line Metro under subcontract of Bodino Engineering s.r.l. which subcontractor of Salini Spa Scope of Work Georeferenced Topographic Survey for 17 stations, Fit Out of Cladding Engineering for seven stations
In cooperation wit Marco Col at Bodino Engineering Italy
File rendering for tracking
On-site tracking support
Wall & floor marble cladding engineering
Issuing of Fabrication Drawings
Issuing of metal component schedules for substructure handcrafted furnishings and stainless steel parts included in the order
964 ltd activated three individual Technical Teams (two located on site on behalf of the two Italian contractors), which provided on-site services and back office development to support the executive design of the marble cladding and part of the design's metal components, as well as contributing to part of said executive design.
Power in Numbers
440
Days
City Circle Line Copenhagen Denmark
Location