
Cityringen Copenhagen
Circle line Metro at Copenhagen Denmark Scope of Work procurement of granite, cast iron grids, aluminum lovers, Stainless Steel entrance gates
In cooperation with Marco Col at Bodino Engineering subcontractor of Salini S.p.a.
Production and QC, QS, conformity with EU, EN, BS DK, standards
On-site tracking support
Wall & floor marble cladding engineering
Produced in accordance with Fabrication Drawings for granite slabs, cast iron grids, aluminum lovers, stainless steel gates.
AD ASIA Consulting activated two individual Technical Teams (One in Shanghai and other in Wuxi located on site on behalf of the two Italian contractors), which provided on-site services and back office development to support the executive design of the marble cladding and part of the design's metal components, as well as contributing to part of said executive design.
Regularly Inspection by our own engineer, SGS inspection, Contractual arrangement and Bank coordination though local shipping agent as JAS, custom clearance on Export and transportation by Train from China to Europe.
Power in Numbers
440
Days
Circle Line Metro at Copenhagen Denmark
Location
Project Gallery





