Tendering Without Regrets: RFQ + BOQ + Bid Analysis (A Practical Playbook for Owners)

  • 5 days ago
  • 5 min read

A tender process is often misunderstood as merely collecting a few quotes from potential contractors. In reality, it is a complex and systematic approach designed to mitigate risks and ensure project success. When owners face disappointments in construction outcomes, it is frequently due to a lack of clarity in the tendering phase regarding three critical aspects: scope, quality, and comparability. A well-structured tender process does not guarantee flawless results, but it significantly minimizes unexpected changes, cost overruns, and disputes. In this post, we will outline a practical workflow to help owners navigate the tendering phase effectively.


Start with the Right Tender Pack


A successful tender process begins with a comprehensive and clearly defined tender pack. It's essential that this pack includes more than just basic drawings. Here are the key components:


  1. Coordinated Drawing Set: Ensure that architectural, interior, and MEP (mechanical, electrical, and plumbing) drawings are cohesive.

  2. Clear Specifications and Assumptions: Detailed descriptions of what is expected in terms of materials, workmanship, and standards.

  3. BOQ Structure: A Bill of Quantities (BOQ) that contractors must fill out, allowing for direct comparison of bids.

  4. Bid Instructions and Submission Format: Clear guidelines for how bids should be submitted.

  5. Site Constraints and Logistics Notes: Information that outlines any restrictions or considerations on the project site.

  6. Bid Evaluation Method: A transparent process for comparing offers.


It's also helpful to prepare different "packages" within the tender documentation that specify whether the documents are intended for bidding or for official submissions. Labels like "FOR BIDDING" and "FOR AUTHORITY SUBMISSION" can help clear up any ambiguity about what contractors are pricing against.


Close-up view of a project site with tender documents
This image shows a close-up view of a project site with tender documents laid out for review.

BOQ as a Tool for Comparability


A Bill of Quantities (BOQ) is often seen as a mere cost document, but its true value lies in its ability to create a standardized pricing structure. By requiring bidders to fill out a BOQ, you ensure that all contractors are pricing the same items, which makes it much easier to compare their offers objectively.


In our recommended workflow, the owner or project manager (PM) issues a tender folder and requests bidders fill out the BOQ template instead of providing a lump-sum figure. This approach has been effective in our own "Docs for Bidding" process. Here are the key aspects that the BOQ should accomplish:


  • Consistent Line Items: Each contractor should price out the same items, leaving less room for discrepancies.

  • Clear Units and Quantities: This eliminates confusion over how much material or labor is being included.

  • Room for Bidder Clarifications and Exclusions: By asking bidders to specify exclusions, you can avoid surprises later.


Use RFQ Rules That Prevent "Cheap Bid Wins"


One of the common pitfalls in tendering is the phenomenon of a contractor winning a bid based solely on underpricing or by omitting key aspects of the scope. This often leads to cost recovery through change orders and disputes down the line. Instead of just trying to negotiate harder with contractors, implementing specific Request for Quotation (RFQ) rules can help.


Here are some practical RFQ controls to consider:


  1. Require Exclusions and Assumptions to be Listed: This allows you to see exactly what contractors are excluding from their bids.

  2. Long-Lead Item Lead Times should be Confirmed: This will ensure that all bidders are working off the same timeline.

  3. Proposed Schedule and Manpower Approach: Requesting these details upfront can help you assess the feasibility of each bid.

  4. Confirmation of Compliance with Drawings: Ensure that contractors acknowledge they are responding to the issued drawing set.


Eye-level view of a construction site under review
This image captures an eye-level view of a construction site being evaluated for compliance.

Bid Leveling: The Step Most Owners Skip


Bid leveling is a crucial step that many owners overlook. This process converts various offers into an "apples-to-apples" comparison. To properly level bids, follow these steps:


  1. Check Scope Coverage Line-by-Line Against the BOQ: Make sure each contractor's proposal aligns with the specified items in the BOQ.

  2. Identify Missing or Zero-Priced Items: This will reveal whether any crucial items have been omitted from a contractor's bid.

  3. Normalize Allowances: Ensure that any allowances included in bids are comparable.

  4. Compare Project Schedules, Payment Terms, and Exclusions: Unified metrics will help you gauge which contractor can truly meet your needs.


This step reflects the responsibility of the project manager during the bidding phase: to monitor the process and ensure clarity of documents used for bids.


High angle view of a project manager reviewing bids
This high angle shot shows a project manager assessing multiple bids laid out on a table.

Constructability Review Before Award


A constructability review is an essential step that should not be overlooked before an award decision is made. This ensures that the tender documents are viable for construction. A strong project management contract should include this responsibility, entailing:


  • Reviewing Construction Documents for Viability: Check for buildability and operability.

  • Coordination Between Drawings and Specifications: Identify any potential design conflicts before construction begins.


Skipping the constructability review often leads to costly issues on-site, including delays and disputes resulting from rework.


Award Recommendations Should Be Written and Defensible


Once you have completed the tendering process, it is essential to document your award recommendation clearly. This should include a short written award memo that explains:


  1. Which Bid is Recommended and Why: Transparency in decision-making can protect owners from backlash later.

  2. What was Clarified or Negotiated with Contractors: Include any significant points of clarification that arose during the process.

  3. What Risks Remain: Outlining existing risks prepares stakeholders for any potential issues.

  4. What Must Be Confirmed Before Mobilization: Highlight the steps that need to occur before construction starts.


This level of documentation adds transparency to the process and keeps a clear governance structure, protecting the owner's decision trail.


Treat Change Control as a "Hard Stop" from Day One


Even the best-planned projects will encounter changes. The key differentiator is how well those changes are managed. Implementing a formal change management process from the start is essential. Consider these steps:


  • Formal Documentation: All material changes to the scope should be captured in a written change order or amendment.

  • Baking Discipline into Tender Documents: Including clear instructions and conditions around changes reduces the likelihood of informal "site decisions" that can lead to uncontrolled costs.


The Path Forward: Structured Tendering


By adopting a structured approach to tendering, you can buy not just price, but certainty. Running your tendering process through the following stages can dramatically reduce the risk of disputes and variations:


  • Tender Pack

  • BOQ/RFQ

  • Clarifications

  • Bid Leveling

  • Constructability Review

  • Award Memo

  • Controlled Change Rules


Taking these steps will allow you not just to compare contractors fairly, but also to reduce unexpected variations in the future.



By following these guidelines, you can create a tendering process that would minimize regrets and enhance your project management outcomes. For additional resources on effective tendering and procurement, visit Construction Management Institute.


Let’s embark on a journey towards a successful construction project, where clarity and structure pave the way!