As global temperatures rise and climate change becomes an undeniable reality, operators in Thailand have a pivotal opportunity to adopt low-capex measures to significantly reduce carbon emissions. With the Thai government's proactive policies targeting energy efficiency, businesses can implement rapid carbon reduction strategies without resorting to heavy capital expenditures. This article outlines practical steps that operators can take to optimize HVAC systems, upgrade motors, and enhance controls, resulting in paybacks of just 6 to 18 months.


Why Start with Low-Capex Measures


The push for energy efficiency in Thailand stems from policies set by the Department of Alternative Energy Development and Efficiency (DEDE). These regulations aim for a 30% reduction in energy intensity by 2037. This goal is not just ambitious; it is necessary to comply with the Building Energy Code, which mandates metering and measurement, reporting, and verification (MRV) processes for designated buildings and factories. Quick savings are vital in an evolving energy landscape where energy efficiency is not optional, but a requirement.


The Thai hotel and commercial sectors are uniquely positioned to capitalize on immediate savings. Various studies and project experiences have shown that retrofitting HVAC systems and pumps with variable speed drives (VSDs) is a feasible path to achieving significant energy reduction, often financed through shared-savings contracts or vendor programs.


Eye-level view of a modern HVAC system in a commercial building
A modern HVAC system optimizing energy usage.

The Three Fastest Buckets: What to Do and Why It Pays


1) HVAC Re-Commissioning & Pump/VSD Upgrades


What to Do:

Start by tuning set-points and sequences associated with chillers, condenser water, and chilled water systems. Upgrade and resize pumps, and incorporate variable-speed drives (VSDs). Don't forget to fix faulty temperature sensors, flow meters, and establish good trends for MRV.


Why It Pays:

Often, pumps and fans are oversized. Implementing VSDs can yield power savings of 20% to 40% during part load conditions. For instance, Thai hotels have documented energy reductions approaching 36% through careful pump and VSD upgrades along with controls.


Quick math illustrates the potential here: Consider an old pump with an input of 55 kW operating for about 5,000 hours a year, consuming around 275,000 kWh annually. If post-VSD upgrades result in a 28% reduction, it would equate to savings of approximately 79,000 kWh annually. With electricity priced at THB 4.0 per kWh, this translates to savings of THB 316,000 per year. If the capex for VSD and controls is THB 650,000, the simple payback period is roughly 2.1 years.


High-angle view of a commercial pump system setup
A commercial pump system ready for upgrade.

2) Motor Systems & Compressed Air


What to Do:

Attach VSDs to high-load motors, such as those driving cooling towers, air handling units (AHUs), and process pumps. Carry out leak surveys on your compressed air systems, size compressors correctly, and introduce automatic sequencing to streamline operations.


Why It Pays:

Compressed air systems often lose 20% to 30% of their energy through leaks. By securing VSDs and employing effective sequencing, facilities can stabilize pressure and minimize off-design waste. Additionally, the requirement for evidence and logging ability mandated by DEDE aids in substantiating savings.


3) Controls & Scheduling


What to Do:

Revise your Building Management System (BMS) schedules, adopt occupancy-based ventilation, broaden temperature dead-bands, and look into nighttime and shoulder-hour strategies. Adding set-point governance can help prevent drift over time.


Why It Pays:

These measures generally require no or minimal capex, as they capitalize on existing infrastructure. They focus on sustaining gains across different seasons. Furthermore, these strategies align seamlessly with the Building Energy Code established by DEDE.


Close-up view of advanced controls in a monitoring system
Advanced controls optimize building performance.

Case Study: Hilton Hua Hin — Pumps, VSDs, and Control Logic


Challenge

At the Hilton Hua Hin, aging pumps and manual operations were hindering chiller efficiency.


Intervention

In response, the team made several impactful changes: replacing chiller and condenser pumps, installing VSDs, and integrating smart control logic. Additionally, they performed a system audit utilizing hydraulic measurements.


Outcome

These interventions led to an impressive 36% energy saving, equivalent to avoiding approximately 120,000 kg of CO₂ emissions annually. The system now dynamically adjusts according to the building's load, illustrating the importance of modern control logic.


Make It Bankable: MRV, Policy Alignment, and Procurement


Metering & Logs

Establish a "Proof Pack" encompassing interval electricity data, BMS trends, pump curves, and calibration certificates. Such a collection aligns with DEDE’s audit culture, ensuring that claims of energy savings are verifiable and credible.


Cost Curves & Policy Support (Hotels)

Research indicates that many energy efficiency measures in Thai hotels are financial winners when lifetimes and discount rates are realistically considered. However, some projects may require support or vendor financing to bridge confidence gaps.


Procurement Leverage

Utilize vendor shared-savings models and consider integrating energy efficiency with renewable energy options like solar. Successful Thai businesses like WHA demonstrate that combining multiple measures can yield compressed payback times.


The Math You'll Paste into Your Board Deck


Simple Payback Calculation

```text

Payback (years) = Capex (THB) / Annual Savings (THB)

```


Cost per Ton CO₂e

```text

Cost/ton CO₂e = (Capex / Project Life) / Annual CO₂e Reduction

```


Example Abatement Curve Inputs


  • Measure A: Pump VSD on CHW loop → Capex THB 650k; save 79,000 kWh/year; 47 tCO₂e/year @ 0.6 kg/kWh → Cost/ton ~ THB 460/tCO₂e; Payback ~ 2.1 years.

  • Measure B: AHU fan VSD + schedule → Capex THB 350k; save 45,000 kWh/year; 27 tCO₂e/year → Cost/ton ~ THB 430/tCO₂e; Payback ~ 1.9 years.


Adjust this information according to your metering data, tariff rates, and appropriate grid emission factors.


Common Pitfalls (and How to Avoid Them)


  1. No Baseline: Without proper baseline data, your claimed savings can be questioned. Overcome this by implementing a 4- to 8-week pre-measurement plan.

  2. Set-Point Drift: Maintain governance standards to ensure set-point stability over time. Document your standards to lock in necessary adjustments.


  3. Oversizing & Control Conflicts: Prior to installing VSDs, validate pump curves and control parameters for optimal performance.


  4. Ignored Maintenance: Dirty coils and strainers will erode your ROI. Schedule regular maintenance checks alongside controls upgrades.


  5. Audit Gaps: Keep all calibration certificates and photo evidence organized. Align these with the reporting cadence required by DEDE.


Your Six-Week Plan for Implementation


Week 1

Appoint a Person Responsible for Energy (PRE); gather all meters and loggers; set savings governance standards.


Week 2

Collect 12 months of interval data; begin pre-measurement for pumps and fans; export BMS trends.


Week 3

Conduct an HVAC walk-through; confirm pump curves; identify potential VSD locations and tighten schedules.


Week 4

Issue specifications and requests for proposals (RFPs) that include measurement, reporting, and acceptance tests.


Week 5

Install VSDs and controls; clean coils and strainers; commission differential pressure logic.


Week 6

Initiate measurement and verification (M&V) efforts; publish results; set standards for set-points and audits.


By following this structured approach, businesses in Thailand can navigate the complexities of energy efficiency improvements and align with DEDE’s best practices.


Get Started on Your Energy Efficiency Journey


Ready to take the next step? Schedule an energy walkthrough today, complemented by a VSD and controls specification. This will help you create a quick-win plan, drawing from the insights shared above while ensuring your operations are audit-ready and aligned with DEDE norms.