top of page


Material Samples, Mock-Ups and Approvals Protect Design Quality Before Installation
Learn how material samples, mock-ups, and written approvals help protect design quality, reduce installation risks, and support better construction decisions
-
Nov 105 min read


Local Materials or Imported Finishes: How to Make the Right Project Decision
Local and imported materials should be compared by more than unit price. This article explains how total delivered cost, lead time, installation, replacement, maintenance and supplier support affect the right project decision
-
Nov 94 min read


Modular Living in Thailand When Does It Actually Make Commercial Sense
Modular living is not automatically faster, cheaper or suitable for every development. Its commercial value depends on the operating model, repetition, site conditions, factory capability, transport, installation, regulatory path and the complete financial structure of the project.
-
Oct 124 min read


When Should a Thailand Property Project Move from Concept to Detailed Design?
Moving into detailed design requires more than an attractive concept. The project should have a clear purpose, reliable site information, an agreed development route, defined operational requirements and sufficient preliminary financial alignment to justify the next stage.
-
Oct 93 min read


Gross Financial Architecture: Testing a Project Before the Detailed BoQ
A detailed Bill of Quantities may not be available when an early project decision is required. Gross financial architecture helps organise preliminary expenditure, operating assumptions, uncertainties and alternative scenarios before the project advances into detailed design.
-
Oct 84 min read


Why a Site Survey Should Come Before Final Design
Final design should respond to verified site conditions, not approximate dimensions or visual assumptions. A properly defined site survey provides the measurements, levels and physical information needed for design coordination, technical review and more informed project decisions.
-
Oct 74 min read


Existing Building or New Construction How to Compare the Two Routes
An existing building may appear faster or more affordable, while new construction may offer greater design freedom. A reliable comparison should examine intended use, property condition, technical constraints, preliminary costs, operational requirements and risk before either route is selected.
-
Oct 64 min read


Concept Design Is Not Decoration How It Shapes the Entire Project
Many property owners view concept design as an aesthetic exercise. In reality, concept design establishes the framework that influences planning, budgets, construction approaches, operational requirements and commercial viability long before detailed drawings begin.
-
Oct 54 min read


From Property Viewing to Investment Brief What Should Be Verified First
A property viewing should produce more than photographs and first impressions. This article explains how intended use, documents, access, building condition, utilities, planning questions, operating assumptions and preliminary costs can be organized into an initial investment brief
-
Oct 25 min read


Thailand Real Estate Projects Should Start with Feasibility, Not Acquisition
An attractive location or purchase price does not automatically make a Thailand property project viable. This article explains how legal position, intended use, site conditions, technical requirements, market demand, budget and operations should be reviewed before acquisition or development.
-
Oct 14 min read


Thailand Property Compliance in 2025: What Developers Reviewed Most
This blog post explores the key compliance checkpoints for Thailand's property market in 2025. It covers updates to the Building Control Act, stricter EIA thresholds for large-scale projects, and foreign ownership regulations like condo quotas and FET documentation. The post also highlights the growing adoption of green building standards such as TREES and LEED, often linked to ESG reporting. It provides actionable insights for developers to create compliance dashboards for
-
Dec 30, 20254 min read


From Zoning to Opening Day: The Permission Pathway for Property Development in Thailand
This blog post provides a clear roadmap for obtaining permits and approvals for property development in Thailand. It covers zoning checks, essential pre-design studies, core municipal approvals, special permits, and strategies to avoid common delays. The article concludes with a practical checklist and explains how AD ASIA Consulting can manage the entire permitting process from planning to occupancy
-
Aug 19, 20254 min read
Blog Articles
Discover insightful articles and expert tips in our blog, covering a diverse range of topics to inspire and inform you.
Contact Us
Address
13 Soi Rama Nine 43, (Soi 21 Saree 4)
Pattanakarn, Suanluang, Bangkok 10250 Thailand
Contact
+66 (0)2 318 6845
Opening Hours
Mon - Fri
8:30 am – 5:30 pm
bottom of page
