top of page

From Concept to Handover: AD ASIA’s 12-Step Fit-Out Method in Bangkok & ASEAN

  • Sep 8
  • 4 min read

In 2025, the pressure on projects across Thailand and the ASEAN region is intensifying. There's an urgent need to open faster, control costs, and meet higher quality assurance and quality control (QA/QC) standards, all while adhering to local codes and brand standards. This pressure emphasizes that the difference between a smooth opening and a costly overrun is often not just about talent; it's about having a disciplined and repeatable method. This is where AD ASIA Consulting’s 12-Step Fit-Out Method comes into play.


Why a Disciplined Method Matters Now


At AD ASIA, we've seen our 12-step method refined across various sectors including interior renovations, hospitality, retail, and office spaces. This method transforms a complex fit-out process into a manageable sequence with clear deliverables, gates, and key performance indicators (KPIs). Our approach is grounded in a documented workflow that spans from pre-design through to post-construction.


Wide angle view of an urban construction site
Urban construction site showcasing a fit-out in progress

The 12 Steps (and What You Should Demand at Each Gate)


1) Discovery & Owner’s Brief


The first step involves capturing the vision, brand, business case, target customer, operational concept, and budget guidelines. The deliverables from this phase include the Owner's Project Requirements (OPR), a list of adjacencies and spaces, and an initial risk register.


Tip: Tie your brief to the Profit and Loss (P&L) model, such as Revenue Per Available Room (RevPAR), to ensure that aesthetic decisions align with revenue potential.

2) Site Due Diligence & Constraints


Next, it's vital to de-risk the project by examining real-world aspects like structure, mechanical, electrical, and plumbing (MEP) capacity, egress routes, landlord criteria, and compliance with local codes. Deliverables include validated as-builts, service surveys, load checks, and fire-life-safety (FLS) reviews.


Why this matters in Thailand: The Building Control Act sets clear constraints, and understanding these early can prevent costly redesigns.

3) Concept Design


In this phase, you translate the brand and operations into a workable concept for the physical space. Deliverables include mood boards, key elevations, zoning diagrams, and a shortlist of feature materials.


Gate: No progression until the concept receives a "Feasibility fit" sign-off that satisfies both operational and services logic.

Eye-level view of a concept design mood board
A mood board illustrating concept design elements for a fit-out

4) Target Budget & Class-4/3 Cost Plan


Setting a realistic cost ceiling, complete with contingency plans by package, is key in this step. Deliverables include a preliminary Bill of Quantities (BOQ) at Class-4/3 and value-engineering options that consider appearance and lifecycle costs.


Governance: Utilize an Owner's Dashboard to track costs against budget forecasts.

5) Design Development & MEP Coordination


This step converts the concept into coordinated drawings across interior design, MEP, and FLS. The focus here is on creating a clash-free design set suitable for authority submissions and pricing.


Deliverables: Detailed drawings, lighting lux maps, and joinery specifications.

6) Authority & Landlord Approvals


Securing approval to build is crucial. The deliverables include permit packages per the Building Control Act and landlord approvals, among others.


Note: Approvals should be sequenced with design freeze to compress the critical path effectively.

7) Final BOQ, Tender Strategy & Procurement


Protecting design intent while ensuring efficient procurement is essential. This stage involves finalizing the BOQ, vendor shortlists, and contract drafts.


Risk control: Lock in long-lead items and define inspection and test plans (ITPs).

8) Contracts & Mobilization


Here, you mobilize the right team for execution based on well-documented scope and exclusions. Deliverables include contract award letters and risk assessments to prevent scope creep.


9) Fit-Out Execution & Quality Management


Execution must be done meticulously. Key deliverables include weekly S-curves, inspection requests, mock-ups, and photo logs to trace job progress and quality control.


Close-up view of a construction site with quality control checks
Construction site showing quality checks during fit-out execution

10) Commissioning & Pre-Handover


Before opening, all systems must integrate seamlessly. Deliverables from this phase include commissioning scripts and O&M manuals.


Gate: Confirmation that integrated testing results meet FLS sign-offs.

11) Handover, Soft Opening & Defects Liability


Smoothly transitioning to opening requires practical completion certificates and emergency drills. KPIs to monitor include keeping defects under 2% of contract value during the Defects Liability Period (DLP).


12) Post-Occupancy Evaluation (POE) & Continuous Improvement


Finally, it’s crucial to capture lessons for future projects. A 90-day POE focuses on feedback, energy baselines, and maintenance tickets—all vital for refining future fit-outs.


The Governance Spine: Documents, KPIs, and Gates


Implementing a structured governance framework is vital. Utilize an Owner’s Dashboard that monitors budget, commitments, and critical paths consistently.


KPIs that matter: Ensure cost variance stays within +3% and schedule deviations are less than 10 days from the baseline.

Increasingly, owners are looking for clarity and visibility in the fit-out process. This is why process discipline is crucial from pre-design to post-construction.


Thailand/ASEAN Compliance: Practical Notes for Owners


Thailand Permits


The Building Control Act governs various compliance aspects in Thailand, such as fire safety and special-use conditions. Ensuring these are handled correctly avoids future abundance of red tape.


Food & Beverage


Particularly in kitchen MEP design, addressing issues like grease management early in the design process prevents unforeseen rework.


Cost & Time Control


Key levers include strict design-to-budget practices, locking long-lead times upfront, building mock-ups early, ensuring clear sign-offs, and keeping an eye on owner visibility.


How AD ASIA Can Help—Immediately


If you are looking to streamline your project, consider reaching out to AD ASIA. We provide a free starter kit that includes an Owner’s Dashboard template along with a comprehensive 12-Step Gate Checklist.


Get Started: You can initiate a two-week engagement for a Design & Cost Reality Check where we evaluate your brief, test fit the space, and identify critical risks.

Our end-to-end delivery model ensures seamless integration and compliance in Thailand and the broader ASEAN market.


Let’s work together to de-risk your project's opening. For a confidential consultation, please visit adasiaconsulting.net.


High angle view of a building's construction with workers
A high angle view of a fit-out site showing teamwork during the building process

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating*
bottom of page